Multifunction building HOLPORT II

Location
Praha 7 - Holešovice

Contractor
Hinton, a.s., Vinohradská 1597/174, Praha
Project Manager: Ing. Ondřej Bielak
Project Leader: Ing. René Bednarek

Investor
MedPort, a.s.
Náměstí Republiky 1078/1, Praha 1

Architect
Ing. Arch. Stanislav Fiala
Fiala + Němec s.r.o.

Construction phase
01/2018 – 01/2020

Project description:
Holport II, designed by architect Stanislav Fiala, presents new multifunction building that completes the corner of Přístavní and Komunardů street where two buildings had to be demolished due to poor structural condition after the Prague Flood in 2002. The project of Holport II brings new spirit of modern architecture with green terraces and exposed concrete on the façade to one of the busiest streets in lower Holešovice. The first two floors provide retail/office space, from the second floor up attractive 1 to 6-bedroom apartments are designed. Most of the apartments on the street side of the building offer terraces or balconies. The technical amenities, garages and storage rooms are situated on 3 basement floors.The marketing name of the project reflects the address – Komunardů 35 and more information can be found here: https://www.komunardu35.cz


Photogallery